Warning: Can't synchronize with repository "(default)" (/home/git/ome.git does not appear to be a Git repository.). Look in the Trac log for more information.
- Timestamp:
-
10/13/11 15:24:20 (13 years ago)
- Author:
-
jburel
- Comment:
-
Legend:
- Unmodified
- Added
- Removed
- Modified
-
-
Property
Sprint
changed from
2011-08-18 (3)
to
2011-10-27 (1)
-
Property
Summary
changed from
Mail lists future plans
to
Possible model changes
-
Property
Remaining Time
changed from
to
0.25
-
Property
Milestone
changed from
OMERO-Beta4.3.2
to
OMERO-Beta4.4
-
initial
|
v6
|
|
1 | 1 | Mail the lists a summary of our plans for developing the data model over the next year. |
| 2 | |
| 3 | Follow possible changes: |
| 4 | * New 3D ROI model |
| 5 | * Rework Detector |
| 6 | * EM Additions (Probably needs detector changes) |
| 7 | * Rework Lightsource |
| 8 | * Rework Instrument |
1.3.13-PRO © 2008-2011
Agilo Software all
rights reserved
(this page was served in: 0.12273 sec.)